Views: 0 Author: Site Editor Publish Time: 2025-12-06 Origin: Site
1. This scheme is divided into four parts: Automatic framing; Automatic feeding conveyor line; Automatic cushion strip conveyor line; And automatic material frame logistics system. It can save 2 people for a single extrusion machine in a single shift, and 4 people for a single extrusion machine during the day shift and night shift.
2. This scheme uses fixed material frames and fixed cushion strips.
3. Automatic framing: Using a planer type mechanical mobile phone mechanism, it is equipped with an automatic material division, counting, and feeding synchronous belt conveyor line, and a dual station automatic counting and pad placement mechanism, with a maximum storage capacity of 1,200 pads. The sandblasting machine automatically counts and divides materials while unloading, and executes the framing action after counting the required quantity. The design time for a single framing is 10 seconds, with a gripping force of 1,000KG. The material sorting time for a single piece is 3 seconds, and a single shift can produce 14,400 pieces (continuous production). The single-layer framing time is calculated as 1.3 minutes for 20 pieces per layer, and 26 minutes for a single frame. Continuous production daily framing capacity of 55 frames * 0.6 tons=33 tons (continuous production)

content is empty!